Profitability for Bitcoin Miner Avalon 721 6TH
Calculated for
1 BTC = $ 84744.1
Profit / Day
$ 0.54
Mined / day
0.00 BTC
Power cost / Day
$ 2.448
Profit / Week
$ 3.76
Mined / Week
0.00 BTC
Power cost / Week
$ 17.14
Profit / Month
$ 16.47
Mined / Month
0.00 BTC
Power cost / Month
$ 73.44
Profit / Year
$ 195.89
Mined / Year
0.00 BTC
Power cost / Year
$ 893.52
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 84744.1..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.

Your opinion about the Bitcoin Miner Avalon 721 6TH