Profitability for EBIT E11++
Calculated for
1 BTC = $ 84744.1
Profit / Day
$ 16.19
Mined / day
0.00 BTC
Power cost / Day
$ 5.7024
Profit / Week
$ 113.30
Mined / Week
0.00 BTC
Power cost / Week
$ 39.92
Profit / Month
$ 486.72
Mined / Month
0.01 BTC
Power cost / Month
$ 171.07
Profit / Year
$ 5907.64
Mined / Year
0.07 BTC
Power cost / Year
$ 2081.38
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 84744.1..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.

Your opinion about the EBIT E11++