Profitability for T9 Antminer

Calculated for
1 BTC = $ 84744.1
1 BTC = $ 84744.1
Profit / Day
$
1.68
Mined / day
0.00 BTC
Power cost / Day
$
4.53888
Profit / Week
$
11.75
Mined / Week
0.00 BTC
Power cost / Week
$
31.77
Profit / Month
$
51.58
Mined / Month
0.00 BTC
Power cost / Month
$
136.17
Profit / Year
$
612.91
Mined / Year
0.01 BTC
Power cost / Year
$
1656.69
Disclosure: Mining metrics are calculated based on a network hash rate of 94,518 GH/s and using a BTC - USD exchange rate of 1 BTC = $ 84744.1..Block reward is fixed at 0 BTC and future block reward reductions are not taken into account. The average block time used in the calculation is?=$lg[59];> 0 seconds. The electricity price used in generating these metrics is $ 0.12 per kWh.